Q. What maintenance is required to maintain my asphalt?A.
For asphalt parking lots and driveways, we usually recommend sealing new asphalt within the first year and crack filling annually to prevent moisture from reaching the base material.
Q. How is the surface prepared before a job?
A.
All surfaces are prepared by thoroughly removing all of the dirt and debris by the use of air blast machinery sweepers, which are highly pressurized for maximum cleaning.